With a location between Jerusalem and Tel Aviv, our Tzora data center will be less than 20 minutes away from the two cities. Built with cutting edge of technology, our data center will offer 16 MW with 6’000 sqm of white floor located 13 meters underground.

Our site will be built with the highest level of protection and with the ability to run autonomously in case of an emergency.

The data center is designed with 3 floors

2 lower-level floors

of 7’379 sqm each

1 upper-level floor

of 2’700 sqm that will serve as the main entrance,
administration, and maintenance

square meters

data centers

power

cabinets

data centers

Power

The Tzora data center will provide N+N redundancy across all systems, making interruptions almost impossible. State-of-the-art electrical equipment will offer maximum efficiency and reliability, and ensure 100% customer uptime. The electricity will be provided by Israel Electric Company.

Cooling

The Tzora data center will use a highly efficient 2N water-cooled chillers system with the support of MATAM Energy Center N+1 CRAH configuration.

Security

The security of our data centers is our highest priority. Using our multi-layered security as well as our on-site security team (present 24/7, every day of the year) will allow us to make sure that your digital assets are as safe as they can be. The data centers are protected with biometric readers and CCTV surveillance with a 60-day retention.

Sustainability

Anan designs its data centers with sustainability and environmental responsibility at the center of its reflection. In Tzora, the data center will be built using a high-efficiency design with a PUE lower than 1.6 and a hyper-efficient cooling system to limit our carbon footprints.